Okanagan Roofers

Articles · Roof replacement

What to expect during a roof replacement

Published . Updated .

A roof replacement starts with prep around the house, then a loud tear-off, a check of the roof deck, and the new roof going on layer by layer. A simple house roof can be done in a day or two. A large, steep, or complex roof can take a week or more, and weather can add days. Expect noise, a bin in the driveway, and stray nails in the yard until the final cleanup. Stay home for the start and the walk-through at the end.

This guide covers how to get ready, what happens each day, and what to check before you pay the final bill.

A week or two before

Confirm the details in writing. The contract should name the start date, the materials, the price per sheet for deck repairs, and what happens if weather delays the job. Our guide on how to hire a roofer in the Okanagan lists what the contract should cover.

Ask the roofer these questions:

  • Where will the bin go, and does it need a permit to sit on the street?
  • Will the crew need an outdoor power outlet?
  • Who applies for the building permit, if one is needed?
  • Does the home need asbestos testing first? (Homes built before 1990 often do.)
  • What time does the crew start each day?
  • Who is the foreman, and how do I reach them?

Tell your neighbors. The noise carries, and the bin or trucks may block part of the street.

The day before

A little prep saves damage and stress:

  1. Move cars out of the garage and driveway so the bin and trucks can get in.
  2. Take pictures, mirrors, and shelves off walls on the top floor. Hammering shakes the walls.
  3. Cover anything stored in the attic with old sheets. Dust and debris fall through during tear-off.
  4. Move patio furniture, barbecues, planters, and toys away from the house.
  5. Turn off the lawn sprinklers and irrigation for the job, so the crew and the tarps stay dry.
  6. Cut the grass short. It is easier to spot nails in short grass.
  7. Mark your septic tank, irrigation heads, and any soft ground the bin should avoid.

If you have solar panels, satellite dishes, or rooftop antennas, ask who removes and reinstalls them. That is often a separate trade.

Kids and pets

Tear-off is loud, and debris falls along every edge of the roof. Keep kids and pets inside or away from the house while the crew works. Dogs that react to strangers or loud noise may do better with a friend or at daycare for the noisy days.

Ask the crew to keep the yard gate closed if you have a dog.

Day one: setup and tear-off

The crew lays tarps along the walls to catch debris and protect plants. Some lean plywood against windows and doors.

Then the old roof comes off. Shingles, nails, and underlayment go down chutes or over the edge into the bin. This is the loudest part of the job.

A careful crew strips only as much roof as it can cover the same day. Our guide on the best time of year to replace a roof covers how weather shapes the schedule.

The deck check

Once the old roof is off, the crew looks at the roof deck. Soft, rotten, or delaminated plywood gets cut out and replaced.

Expect a call or a knock if they find damage. Ask to see it, ask how many sheets they plan to replace, and ask for photos. The price per sheet in your contract applies here. This is the moment that good contracts prepare for.

Putting the new roof on

The new roof goes on in layers. The order is usually:

  • Drip edge along the eaves
  • Self-adhering ice and water membrane at the eaves and in the valleys
  • Underlayment over the rest of the deck
  • Flashing at walls, chimneys, and skylights
  • Vents and plumbing vent collars
  • Shingles or metal panels
  • Ridge vent and ridge caps

At the end of each day, any open roof gets covered. If rain is coming, ask how the crew will protect the house overnight.

Noise, dust, and daily life

Plan for a few hard days at home. Hammering and nail guns run most of the day. Phone calls and naps will be tough. If you work from home, book a quiet spot elsewhere for the tear-off day.

The crew may need a washroom. Ask the roofer what they have arranged, so nobody has to ask on the day.

The final cleanup

A good crew leaves the site cleaner than it found it. Cleanup should include:

  • Removing all old roofing and the bin
  • Clearing the gutters of shingle debris and nails
  • Running a magnet over the lawn, driveway, and flower beds
  • Picking up any wrapping, caps, and offcuts
  • Taking down the tarps and checking the plants

Nails hide in grass and gravel. Walk the yard yourself a day or two later, and again after the first mowing.

The final walk-through

Walk around the house with the foreman before you make the last payment. Look up at the roof from each side. Check that:

  • The shingle lines look straight and even
  • Flashing is in place at walls, chimneys, and skylights
  • New vents and vent collars are installed
  • Gutters are attached and clear
  • No damage shows on siding, windows, decks, or plants
  • The driveway and yard are clear of nails

Ask for photos of the deck repairs and of the roof during the install. Get the paperwork: the final invoice, the workmanship warranty, the manufacturer’s warranty, and any permit sign-off. Some manufacturer warranties need to be registered, so ask who does that.

After the job

Check the attic and ceilings after the first big rain. Look for drips, stains, or damp insulation. Call the roofer right away if anything looks wrong. Small problems are easier to fix while the crew still has the job fresh in mind.

Keep a file with the contract, warranties, photos, product names, and colors. You will want it for future repairs, insurance, or a sale.

Find a roofer

Browse the roofing contractors in our directory and ask each one how they run a job from setup to cleanup. Our guide on what drives the cost of a new roof will help you compare the quotes.

Keep looking around

Browse the business directory or read more local articles.